Album Name: Golf Course Projects Return to Albums
Album Date: Feb 28, 2007
(click an image to enlarge and start a slide show)
Walking bridge over #18 creek. #5 Tee Box extension project.  New grass protected with cover. New drainage area #1 fairway Before Lake renovation Before Lake Renovation
Another before lake renovation Looking at area where dam will be broken. Equipment moves in to drain the lake. Trenching from creek to lake. Almost there!
The dam is broken! Water is running! Lake water running over #18 walking bridge Lake almost empty! Whats left is at Men's #10 Tee!
Dozer preparing the area to dump the silt.  Digging the area around #12 Blue tee for the silt. Seining remaining fish.  Members seining and moving fish to the other lake. Retrieving the fish to move to another pond!
Removing the silt.  Two of three pieces of heavy equipment removing silt. Before the big rains Men's #12 Tee Box area mostly filled with silt. Work begins again!
First step, pumping recent rains out! Moving silt by #10 Tee Boxes Working by entrance road Dozers have been working since last week again on the lake.  Another view of work on the lake project.
Down to the clay now!  Silt has been removed. Both dozers will be out of here, if the weather continues dry! Continuing to deepen the lake more than when it was first built. The damn was plugged on May 25th and the heavy equipment moved out.  Now we tidy up!! The lake is already filling up with recent rains!